The sole responsibility of this publication lies with the author. The European Union is not responsible for any use that may be made of the information contained therein

  • Black Twitter Icon
  • Black Facebook Icon
  • Black LinkedIn Icon
  • Black YouTube Icon
Please reload

Recent Posts

Inauguration ceremony of the first cold ironing installation in Eastern Mediterranean at the port of Killini

December 21, 2018

1/6
Please reload

Features

Technical meeting at Killini Port

December 20, 2017

With the elemed project in full roll out, a HAZID analysis workshop took place in the Port of Killini today. Representatives from the Port authority, the municipality of Killini-Andravida, Electrotechnical and Marine Engineering specialists gathered, in order to identify and analyze the complete shore connection layout and envisaged operations, focusing on optimizing safety and efficiency aspects. The Port of Killini Shore Power Sea connection, the first of its kind, in the Eastern Mediterranean is being developed under the elemed project. The tendering process as per the Hellenic National legislation has already been completed and commissioning is expected before summer 2018. In the mean time a similar installation is expected onboard the M/V Fiore Di Levante alllowing her to become the first RoPax ferry in the Mediterranean area relying on shore power for her night stay in port.

 

 

 

Tags:

Share on Facebook
Share on Twitter
Please reload

Follow Us
Please reload

Archive
  • Twitter Basic Square
  • Facebook Basic Square
  • LinkedIn Social Icon